Close but no Cigar

Industrial equipment often has long lead times between order placement and delivery to the installation site.  Some lead times are several months.

Large piping doesn’t have quite the long lead time, but it is often fabricated in advance, off-site, based on building and other equipment dimensions.
One slight dimension or measurement error can result in a severe HDS situation that is not easily rectified.